Ultimate construction dehumidifier
For a converted stable or barn: 110 litres a day for a large, open space with a new floor and thick brick walls.
View this unitHerve gives its name to a region and a cheese. The Pays de Herve is a rolling plateau of meadows, hedges and standard orchards, known for Herve cheese and fruit syrup. The small town lies in the middle of that landscape, just over an hour's drive from our warehouse in Aartselaar.
HerveThe right price starts with what needs to dry. For a whole house, wet screed or plasterwork you calculate a complete drying package; for a single room, a single unit may be suitable. Delivery in Herve is included in your drying package.
You hire a drying package calculated on the volume, the material and the temperature of your site. The price is known in advance and covers delivery, installation, the moisture reading at the start and at handover, and collection. Not dry within the calculated period? Then the hire continues free of charge, under the terms.

You don't need to combine units yourself. We calculate your drying package based on the floor area, the material and the layer thickness. You see the package price in advance, including delivery to postcode 4650, installation, readings before and after, and collection.
A calculated set-up for your floor, matched to the thickness of the screed. The final reading helps you and your floor layer decide when finishing can start.
More about this dryingConstruction dehumidifiers and fans for even drying throughout the house. We choose the capacity and spread the units over the rooms.
More about this dryingA leak or a flood? Have the cause repaired and standing water removed first. We assess the wet materials and match the drying to them.
More about this drying100% drying guarantee included. Is the material still not dry within the calculated period, despite correct drying conditions? Then you keep hiring the units free of charge, under our drying guarantee terms. This applies to calculated packages that we deliver and install; single units for collection are not covered.
No deposit. The calculator shows your total price and the extras you choose yourself, such as a condensate pump, extra heating or an official moisture report.
The municipality includes Battice, Bolland, Charneux and Xhendelesse, among others. At Battice the E40 and the E42 cross. Around that interchange, farms, business parks and new residential areas lie close together.
The typical Pays de Herve farmhouse is of red brick, with limestone surrounds and often an inner courtyard. Anyone converting such a farmhouse into a home lays new floors in stables and barns that were never meant to be lived in. There is no damp-proof membrane underneath, so moisture comes from below and from the thick walls at the same time.
A new build on a housing estate near Battice or Herve often stands open for a while before the roof is on. During that period the masonry and floor slabs absorb a lot of rainwater. If you put in a dehumidifier as soon as the shell is closed, the plasterer can start sooner.


For a converted stable or barn: 110 litres a day for a large, open space with a new floor and thick brick walls.
View this unit
Against the thick façade wall of a farmhouse, it breaks up the saturated layer of air, so the moisture can keep coming out of the brick.
View this unit
For a new build on a housing estate near Battice or Herve: 70 litres a day to get the shell ready for finishing.
View this unit
A farmhouse on the plateau cools down sharply in winter. This 30 kW heater brings a large room up to temperature and needs a 400 V connection.
View this unitHerve lies right by the Battice interchange, just over an hour's drive away. You choose a delivery date when you book, and we agree the delivery time with you. If the farmhouse is on a narrow country lane, let us know where a van can turn. The technician places the units and lays the drain himself.
Our collection point in Aartselaar is just over an hour's drive from Herve, so you are on the road for over two hours for each round trip. A farmhouse conversion usually involves several units, and they rarely fit in one car. So you are better off having them delivered and collected.
Boomsesteenweg 12, Unit 11, 2630 Aartselaar
Mon–Fri 08:00–17:00, by appointment
Sites in the province of Liège, each with photos of the site itself. The same team, the same reading at the start and at handover.
The table helps you plan the hire period. A guide time does not confirm that the material is dry enough. The check before finishing is still needed.
| What needs to dry | Without a dehumidifier | With a Vernast drying package |
|---|---|---|
| Cement screed 5 cm | 6 to 9 weeks | 2 weeks |
| Cement screed 6 cm | 8 to 12 weeks | 3 weeks |
| Cement screed 7 cm | 10 to 15 weeks | 4 weeks |
| Plasterwork 1 cm | 1 to 2 weeks | 2 weeks |
| Plasterwork 2 cm | 2 to 4 weeks | 3 weeks |
| Plasterwork 3 cm | 3 to 6 weeks | 4 weeks |
The table gives guide values for planning. The actual drying time depends on the material and the conditions on site. Before finishing, have the residual moisture checked against the requirements of your floor layer or decorator. For calculated packages, free continued hire applies under the drying guarantee terms. How long screed needs to dry explains it case by case.
We deliver in Herve and the surrounding municipalities. Choose a place below for details on hire and delivery, or see our service area in the province of Liège.
Delivery to Amel, Aubel, Baelen and the other places below. Choose your municipality for details on hiring a dehumidifier.
See for each municipality how to hire a construction dehumidifier, what a drying package includes and how to arrange delivery.
From your request to collection. We agree the installation, explain how to use the units and follow the drying process with moisture readings.
Calculate your package online or call us for advice. Give us your site address, your preferred start date and the dimensions of the rooms.
At the agreed time the technician installs the units, connects the condensate drain and explains how to use them.
Use the set-up as the technician explained. Check the condensate drain and report any faults or new moisture problems.
We check the moisture and arrange collection. For calculated packages, free continued hire applies if the drying guarantee terms are met.
Read how customers experience Vernast's delivery, appointments and follow-up. These reviews are about our service across our whole service area.
“Snelle respons en dezelfde dag nog een droger geïnstalleerd. Top service!”
“Zeer goede service en flexibiliteit. Werken zijn uitstekend uitgevoerd. Vriendelijk personeel. Firma zeker aan te raden.”
“We zijn bijzonder tevreden. Het personeel is professioneel én vriendelijk. Het werk is grondig uitgevoerd. Bovendien werd het achteraf goed opgevolgd.”
Our drying experts will help you straight away, with advice tailored to your situation.
With a heavy-duty dehumidifier, a fan and some patience. An old stable has no damp-proof membrane under the floor, and the thick walls absorbed moisture for years. The technician measures at the start where the moisture is and adapts the set-up accordingly, so the floor and plasterwork get dry enough for finishing.
As soon as the roof is on and the windows are in. Earlier makes little sense, because then you are drying the outside air. From that moment a dehumidifier removes the rainwater from the masonry and floor slabs, so the plasterer starts on a drier surface.
Yes. Give the full address and mention whether the farmhouse is on a narrow road or a farm track. Then the technician knows in advance where he can stop and how far the units need to be carried.
Yes. Your contractor or floor layer can reach us himself as well. Questions in French? Feel free to email or call us.
Installed and set up by our technician, with a moisture reading at the start and at handover. Prefer to talk it through first? Feel free to call us.

Briefly describe what needs to dry and how big the room is. A drying specialist will reply within one working day, with a proposal for the right package.