Drying screed and plasterwork in Hasselt

Construction drying · Hasselt · Construction dehumidifier hire in Limburg

After plastering and screeding, the house in Hasselt still held a lot of construction moisture. Vernast Bouwdrogers brought the humidity down in a controlled way with professional dryers and fans and tracked the drying process with moisture readings, so the remaining finishing could start without risk.

Construction dehumidifier and fan at work in the house in Hasselt after the plastering and screeding
Treatment
Construction dryingafter plaster & screed
Diagnosis
Construction moistureraised humidity
Approach
Dryers + ventilationcontrolled drying process
Monitoring
Moisture readingsdown to a safe level
The project

Plenty of construction moisture after the shell finishing

In this house in Hasselt, the plastering and screeding had just been completed. Fresh coats of plaster and a new screed together bring hundreds of litres of water into the building. As long as that construction moisture remains in the walls and the floor build-up, the humidity stays too high to continue finishing safely. Vernast Bouwdrogers was called in to remove that moisture quickly and in a controlled way.

  • High moisture content in the walls and screed after the plastering and screeding
  • Raised humidity that would hold up the remaining finishing
  • Risk of mould and moisture damage without targeted drying
  • Not enough natural ventilation to remove the construction moisture

Our diagnosis

Moisture readings at several points let us map the moisture content in the house. The cause was clearly construction moisture: the excess water from the fresh plasterwork and the screed evaporates slowly and keeps the humidity artificially high. Without a managed drying process, the finishing would be delayed by months and there would be a risk of mould growth and damp patches.

The work, step by step

Setting up the drying equipment. In the living areas and the rooms under the roof we placed professional condensation dryers that draw the moisture straight out of the air.

Getting the air moving. Powerful fans pushed the damp air along the walls and screed, so the moisture was removed evenly and right into the corners instead of lingering in one spot.

Monitoring with moisture readings. During the drying process we checked the moisture values on the façade and on the substrate, so the dryers were only removed once the house had reached a safe level, ready for finishing.

Ready for further finishing. With the construction moisture gone, the team could carry on with the finishing without risk: a dry, stable base with no chance of moisture problems later on.

Behind the scenes

The project in pictures

From the dryers in place to the check readings: this is how the construction drying in Hasselt went. Browse with the arrows or pick an image below.

Spacious living area in Hasselt after the plastering and screeding, ready for the drying process
1 / 15Open living area ready for the drying process
Construction dehumidifier and fan set up next to the stairwell
2 / 15Dryer and fan at work by the stairs
Powerful fan pushing the damp air through the hallway with bare brickwork
3 / 15Fan pushing the damp air through the hallway
Condensation dryer extracting construction moisture in the room under the roof
4 / 15Condensation dryer in the room under the roof
Condensation dryer running against the construction moisture in the plastered walls
5 / 15Dryer running against the construction moisture in the walls
Drying and measuring set-up in the bedroom on the upper floor
6 / 15Drying and measuring set-up on the upper floor
View of the open floor with screed during the drying period
7 / 15The open floor during the drying period
Attic room with roof window being dried in a controlled way
8 / 15Attic room with roof window being dried
Even drying right into the corners of the attic room
9 / 15Even drying right into the corners
Front view of the house in Hasselt at dusk
10 / 15The house in Hasselt at dusk
Moisture reading on the façade to determine the moisture content
11 / 15Moisture reading on the façade
Check reading on the substrate during the drying process
12 / 15Check reading on the substrate
Entrance hall and stairs after the plastering was completed
13 / 15Entrance hall and stairs after the plastering
Vernast Bouwdrogers can also be deployed in commercial and retail premises
14 / 15Construction drying for commercial premises too
House with a classic façade within the Vernast service area
15 / 15House with a classic façade in our service area
The result

From construction moisture to a dry house ready for finishing

Why clients choose us

Drying fast without putting the finishing at risk

We speed up the drying process with the right combination of condensation dryers and ventilation, and keep measuring until the moisture has really gone. Carried out by our own team of Vernast experts, so you lose no time and never pay twice for the same problem.

After the work

Ready for healthy finishing

With the construction moisture removed in a controlled way and the moisture values at a safe level, the house can be finished without risk. This project shows how targeted construction drying makes the difference between months of delay and a smooth, healthy handover.