Drying screed and plasterwork in Hasselt
Construction drying · Hasselt · Construction dehumidifier hire in LimburgAfter plastering and screeding, the house in Hasselt still held a lot of construction moisture. Vernast Bouwdrogers brought the humidity down in a controlled way with professional dryers and fans and tracked the drying process with moisture readings, so the remaining finishing could start without risk.

Plenty of construction moisture after the shell finishing
In this house in Hasselt, the plastering and screeding had just been completed. Fresh coats of plaster and a new screed together bring hundreds of litres of water into the building. As long as that construction moisture remains in the walls and the floor build-up, the humidity stays too high to continue finishing safely. Vernast Bouwdrogers was called in to remove that moisture quickly and in a controlled way.
- High moisture content in the walls and screed after the plastering and screeding
- Raised humidity that would hold up the remaining finishing
- Risk of mould and moisture damage without targeted drying
- Not enough natural ventilation to remove the construction moisture
Our diagnosis
Moisture readings at several points let us map the moisture content in the house. The cause was clearly construction moisture: the excess water from the fresh plasterwork and the screed evaporates slowly and keeps the humidity artificially high. Without a managed drying process, the finishing would be delayed by months and there would be a risk of mould growth and damp patches.
The work, step by step
Setting up the drying equipment. In the living areas and the rooms under the roof we placed professional condensation dryers that draw the moisture straight out of the air.
Getting the air moving. Powerful fans pushed the damp air along the walls and screed, so the moisture was removed evenly and right into the corners instead of lingering in one spot.
Monitoring with moisture readings. During the drying process we checked the moisture values on the façade and on the substrate, so the dryers were only removed once the house had reached a safe level, ready for finishing.
Ready for further finishing. With the construction moisture gone, the team could carry on with the finishing without risk: a dry, stable base with no chance of moisture problems later on.
The project in pictures
From the dryers in place to the check readings: this is how the construction drying in Hasselt went. Browse with the arrows or pick an image below.















From construction moisture to a dry house ready for finishing
Drying fast without putting the finishing at risk
We speed up the drying process with the right combination of condensation dryers and ventilation, and keep measuring until the moisture has really gone. Carried out by our own team of Vernast experts, so you lose no time and never pay twice for the same problem.
Ready for healthy finishing
With the construction moisture removed in a controlled way and the moisture values at a safe level, the house can be finished without risk. This project shows how targeted construction drying makes the difference between months of delay and a smooth, healthy handover.