A building will eventually dry out on its own, but at the pace of the seasons, with all the risks that brings for your schedule and finishing work. Controlled construction drying makes that process predictable, measurable and calculated for your building.

When a building dries on its own, chance conditions set the pace: the outside temperature changes, windows are opened and closed, and at night the temperature drops and the humidity rises. One day a lot of moisture is removed, the next day hardly any. Controlled construction drying stabilises those variables; the big difference is control and predictability.
Painting, laying parquet or fitting floor coverings on a substrate that is too damp causes problems later on. Controlled drying shortens the waiting time between construction phases without ignoring the curing times manufacturers require: construction drying supports and optimises the natural process; it skips nothing.
A structure that stays damp for months is the ideal breeding ground for mould spores, especially behind cupboards and skirting boards and in poorly ventilated corners. If mould has already appeared, we tackle it with an ozone treatment, always combined with proper drying.

Construction dehumidifiers are often hired out on the strength of a single figure. But the amount of water actually extracted varies greatly with temperature and humidity: a unit that manages dozens of litres in warm, humid test conditions condenses far less once the building is already partly dry. That is why our calculator never sizes on the figure on the machine alone, but on:
Choosing the biggest construction dehumidifier is easy; working out the right drying strategy takes more. Which materials need to dry? Can air circulate freely? One drying zone or several? Only then is the capacity determined and distributed: that is your drying plan, and you get it straight away from the calculator.

Two dehumidifiers with the same combined capacity as one heavy machine: identical on paper, but not in a real home. A home consists of rooms, hallways, doorways and corners, and air takes the easiest route. Compare it with heating: one enormous radiator in the living room does not warm the bedrooms.
An excellent climate around the unit, hardly any air exchange in rooms further away. Enough capacity on paper, uneven drying in practice, and often unnecessary energy consumption from oversized units in compact homes.
The same total capacity, distributed where it is needed, supplemented with fans that help the air circulate better. A more even drying climate, a predictable result and a lower energy bill.
At Vernast you do not pick a machine from a list. You enter your floor area, ceiling height and situation in the drying calculator (drying plasterwork, drying screed, water damage or a cellar) and immediately get the right package with its drying time and one all-in price. Delivery, installation, moisture readings before and after, collection and all accessories are included. You book, pay and schedule the installation entirely online, with a 5% discount for online payment. Prefer individual units? You can collect them at a good price along the A12 in Aartselaar. Questions during the hire? That is what customer service is for.
Because we calculate instead of guessing, we dare to promise that. The final measurement confirms the result, in black and white.
Start the calculation
Not sure about the right approach for your project? Ask your question and you will get an answer from a specialist within one working day.
Thank you! A drying specialist will contact you within one working day.