Performance construction dehumidifier
For a new-build home with fresh screed. Extracts up to 70 litres a day from the air in rooms up to about 400 m³, enough for an entire ground floor.
View this unitAmel, Amblève in French, lies in the Belgian Eifel, in the German-speaking part of the province of Liège. The municipality consists of villages on the high plateau: Amel, Heppenbach and Meyerode, with hamlets around them such as Born, Deidenberg and Schoppen. From Aartselaar it takes just over two hours to drive there.
AmelThe right price starts with what needs to dry. For a whole house, wet screed or plasterwork you calculate a complete drying package; for a single room, a single unit may be suitable. Delivery in Amel is included in your drying package.
You hire a drying package calculated on the volume, the material and the temperature of your site. The price is known in advance and covers delivery, installation, the moisture reading at the start and at handover, and collection. Not dry within the calculated period? Then the hire continues free of charge, under the terms.

You don't need to combine units yourself. We calculate your drying package based on the floor area, the material and the layer thickness. You see the package price in advance, including delivery to postcode 4770, installation, readings before and after, and collection.
A calculated set-up for your floor, matched to the thickness of the screed. The final reading helps you and your floor layer decide when finishing can start.
More about this dryingConstruction dehumidifiers and fans for even drying throughout the house. We choose the capacity and spread the units over the rooms.
More about this dryingA leak or a flood? Have the cause repaired and standing water removed first. We assess the wet materials and match the drying to them.
More about this drying100% drying guarantee included. Is the material still not dry within the calculated period, despite correct drying conditions? Then you keep hiring the units free of charge, under our drying guarantee terms. This applies to calculated packages that we deliver and install; single units for collection are not covered.
No deposit. The calculator shows your total price and the extras you choose yourself, such as a condensate pump, extra heating or an official moisture report.
You mainly find meadows, woodland and scattered farmhouses. The climate is that of the High Ardennes, with long winters, plenty of rain and night frost until late in spring. As a result, the period in which the outside air helps a site dry is shorter here than in Flanders.
The older building type in Amel is the Eifel farmhouse: house and stable under one roof, with rubble-stone walls. When it is converted into a home, new plaster goes onto a cold, thick wall that holds moisture itself. The technician measures during installation how wet the wall is. That way you know later what was construction moisture and what the stone itself carries.
With new builds the calendar counts for a lot. If the shell construction runs on into autumn, the screed and plasterwork have to dry in cold, damp months. An unheated home on the high plateau then stays well below 15 °C, the temperature above which a condensation dehumidifier works well. Adding a site heater or using a desiccant dehumidifier solves that.


For a new-build home with fresh screed. Extracts up to 70 litres a day from the air in rooms up to about 400 m³, enough for an entire ground floor.
View this unit
For a winter site on the high plateau, where an unheated home stays cold for weeks. The heater delivers 30 kW and needs a 400 V (three-phase) connection.
View this unit
For a cold stable or barn becoming living space. This desiccant dehumidifier also absorbs moisture where it is too cold for a condensation dehumidifier.
View this unit
Damp air lingers along a thick rubble-stone wall. The fan gets that air moving, so the dehumidifier can pick it up.
View this unitAmel is just over two hours from our warehouse in Aartselaar, via Liège, Verviers and the A27. You choose a delivery date when you book. In Wallonia we deliver by appointment, and we combine the trip with other addresses in the East Cantons. If snow or black ice is forecast, we call ahead. Also let us know whether the van can get to the farmhouse, because not every drive is paved.
Collecting a unit means just over two hours there and just over two hours back, and the same again when returning it. A construction dehumidifier also has to be transported upright. If you choose delivery, the technician places the units and takes readings at the start and at collection.
Boomsesteenweg 12, Unit 11, 2630 Aartselaar
Mon–Fri 08:00–17:00, by appointment
Sites in the province of Liège, each with photos of the site itself. The same team, the same reading at the start and at handover.
The table helps you plan the hire period. A guide time does not confirm that the material is dry enough. The check before finishing is still needed.
| What needs to dry | Without a dehumidifier | With a Vernast drying package |
|---|---|---|
| Cement screed 5 cm | 6 to 9 weeks | 2 weeks |
| Cement screed 6 cm | 8 to 12 weeks | 3 weeks |
| Cement screed 7 cm | 10 to 15 weeks | 4 weeks |
| Plasterwork 1 cm | 1 to 2 weeks | 2 weeks |
| Plasterwork 2 cm | 2 to 4 weeks | 3 weeks |
| Plasterwork 3 cm | 3 to 6 weeks | 4 weeks |
The table gives guide values for planning. The actual drying time depends on the material and the conditions on site. Before finishing, have the residual moisture checked against the requirements of your floor layer or decorator. For calculated packages, free continued hire applies under the drying guarantee terms. How long screed needs to dry explains it case by case.
We deliver in Amel and the surrounding municipalities. Choose a place below for details on hire and delivery, or see our service area in the province of Liège.
Delivery to Amel, Aubel, Baelen and the other places below. Choose your municipality for details on hiring a dehumidifier.
See for each municipality how to hire a construction dehumidifier, what a drying package includes and how to arrange delivery.
From your request to collection. We agree the installation, explain how to use the units and follow the drying process with moisture readings.
Calculate your package online or call us for advice. Give us your site address, your preferred start date and the dimensions of the rooms.
At the agreed time the technician installs the units, connects the condensate drain and explains how to use them.
Use the set-up as the technician explained. Check the condensate drain and report any faults or new moisture problems.
We check the moisture and arrange collection. For calculated packages, free continued hire applies if the drying guarantee terms are met.
Read how customers experience Vernast's delivery, appointments and follow-up. These reviews are about our service across our whole service area.
“Snelle respons en dezelfde dag nog een droger geïnstalleerd. Top service!”
“Zeer goede service en flexibiliteit. Werken zijn uitstekend uitgevoerd. Vriendelijk personeel. Firma zeker aan te raden.”
“We zijn bijzonder tevreden. Het personeel is professioneel én vriendelijk. Het werk is grondig uitgevoerd. Bovendien werd het achteraf goed opgevolgd.”
Our drying experts will help you straight away, with advice tailored to your situation.
A condensation dehumidifier clearly loses efficiency below 15 °C, and an unheated farmhouse in Amel is often colder than that in winter. That is why here we combine a dehumidifier with an electric site heater, or choose the desiccant dehumidifier that keeps working in the cold. Tell us when you book whether the building is heated.
Yes, we deliver throughout the municipality of Amel, including the hamlets and isolated farmhouses. Tell us what the access is like when you book. With a narrow farm track or an unpaved drive, the technician will bring a sack truck.
Allow just over two hours, and longer with traffic around Liège or winter weather on the high plateau. You choose a delivery date when you book and we agree the delivery time with you, so you do not have to wait all day.
Keep the space as closed as possible, bring it up to temperature with a site heater and let a dehumidifier take the moisture out of the air. Old rubble-stone stable walls release their water slowly, so allow weeks. The reading at the start gives you a point of comparison for later.
Installed and set up by our technician, with a moisture reading at the start and at handover. Prefer to talk it through first? Feel free to call us.

Briefly describe what needs to dry and how big the room is. A drying specialist will reply within one working day, with a proposal for the right package.