A Vernast technician delivers your drying package and installs the complete set-up, calculated for your home. You don't have to lift, position or set up anything.

You always know where you stand: one clear appointment, a heads-up when we are on our way and a set-up that is running before we leave.
Confirmation with delivery date and time slot, plus a calendar invitation.
The technician sends you a message. No waiting in all day.
We go through the rooms and measure the starting moisture content.
Positioning, spreading out, connecting the drain and setting up.
Everything is running and you get a short explanation. Drying has started.
Not installing as much equipment as possible, but using the capacity as efficiently as possible. Click through the steps or simply watch.
We go through the home and divide it into drying zones: which rooms need drying, how are they connected and where is the most moisture? Then we check the electrics, drainage options and conditions. If the situation differs greatly from your calculation, we discuss that first.
Machines go where they can draw in and blow out freely, never pushed tight against walls or obstacles. Instead of one heavy machine in the middle, we spread several machines and air movers across the zones, so every room dries evenly.
If you choose the condensate pump (€2.42 incl. VAT per dehumidifier per day), we connect a continuous condensate drain to a drain, shower, washbasin or floor drain. That way you never have to empty a tank and the machine keeps running day and night, weekends included. Without a pump you empty the tank yourself about twice a day. Optional, but recommended: you add the pump when calculating your package.
Construction dehumidifiers run continuously for long periods and need a stable supply; with several machines we spread them over different circuits. Air movers pull damp air out of hard-to-reach areas. Temperature, circulation and dehumidification together determine the efficiency.
We check the complete set-up, set the target humidity and go over which windows and doors stay open or closed. You get a short explanation, and then the set-up does the work. Questions during the hire? Our customer service is ready to help.
Upper floors are included as long as they can be reached by stairs or a lift. Only when machines have to go up by ladder do we charge a surcharge: that takes extra manpower and equipment.
Our technicians carry the machines up the stairs to every floor, at no extra cost.
If there is a lift, we install on every floor at no extra cost.
No staircase in the house yet? Always let us know in advance, so we can plan the right installation and manpower.

Well meant, but harmful to the drying process, and sometimes even to the machine. We see these classics often, and they cost you drying time:
You let damp outside air in and the installation has to process that extra load all over again. The house stays closed during drying.
Switching them off at night or "just while we're working" stops the drying and extends the hire period. The machines are made to run continuously.
The cooling circuit contains refrigerant: laying the machine flat damages the compressor. Transported flat after all? Let the machine stand upright for 24 hours before starting it.
The set-up is calculated per drying zone. Moving machines or blocking the intake disrupts the circulation, so check with us first.
Dry air has to reach every room. At start-up our technician tells you which doors should be open or closed.
Fresh plaster or a wet screed on top means a new moisture load, and a longer drying time. Let us know and we will recalculate the package.

Not sure about the right approach for your project? Ask your question and a specialist will reply within one working day.
Thank you! A drying specialist will contact you within one working day.