Revolution desiccant dehumidifier
For the cold room on the slope side. This desiccant dehumidifier also absorbs moisture when the temperature stays low.
View this unitHerbeumont lies in a large bend of the Semois. Above the village the ruins of a medieval castle stand on the rocks. From there you see the river looping through the woods. Besides Herbeumont, Martilly and Saint-Médard belong to the municipality. From Aartselaar it is a drive of over two hours.
HerbeumontThe right price starts with what needs to dry. For a whole house, wet screed or plasterwork you calculate a complete drying package; for a single room, a single unit may be suitable. Delivery in Herbeumont is included in your drying package.
You hire a drying package calculated on the volume, the material and the temperature of your site. The price is known in advance and covers delivery, installation, the moisture reading at the start and at handover, and collection. Not dry within the calculated period? Then the hire continues free of charge, under the terms.

You don't need to combine units yourself. We calculate your drying package based on the floor area, the material and the layer thickness. You see the package price in advance, including delivery to postcode 6887, installation, readings before and after, and collection.
A calculated set-up for your floor, matched to the thickness of the screed. The final reading helps you and your floor layer decide when finishing can start.
More about this dryingConstruction dehumidifiers and fans for even drying throughout the house. We choose the capacity and spread the units over the rooms.
More about this dryingA leak or a flood? Have the cause repaired and standing water removed first. We assess the wet materials and match the drying to them.
More about this drying100% drying guarantee included. Is the material still not dry within the calculated period, despite correct drying conditions? Then you keep hiring the units free of charge, under our drying guarantee terms. This applies to calculated packages that we deliver and install; single units for collection are not covered.
No deposit. The calculator shows your total price and the extras you choose yourself, such as a condensate pump, extra heating or an official moisture report.
The area consists of deep forests and steep slopes, with little flat land. Many houses stand on the edge of the woods or halfway up the slope. A good share of them are second homes and gîtes for walkers and kayakers.
A house built against the slope has a back wall that is partly underground. Rainwater and groundwater run along it, and that wall stays damp for most of the year. After a renovation with new plasterwork you want to know whether you are drying construction moisture or moisture that keeps coming back. That is why the technician takes a moisture reading at the start.
Where the woods stand close to the house, the front gets little sun and dries slowly after rain. Inside you notice it as cool, damp air in the rooms on the woodland side. In a holiday home that stays shut for a long time, mould appears on the ceilings. With a heater and a dehumidifier you make such a house habitable again.


For the cold room on the slope side. This desiccant dehumidifier also absorbs moisture when the temperature stays low.
View this unit
Keeps the air moving along the back wall that is half set into the slope, so the moisture does not hang against the plasterwork.
View this unit
For a gîte or a small holiday home. This compact dehumidifier pulls up to 50 litres a day out of rooms up to about 250 m³.
View this unit
Warms up a house in the woods that got through the winter unheated, until the dehumidifier works well. It needs a 400 V connection.
View this unitIt is over two hours' drive, with a stretch of narrow, winding roads down into the valley after the E411. You choose a delivery date when you book, and we agree the time with you. That way we can combine your delivery with other addresses in the area. If the house is on a forest track or a steep drive, mention it when you book, and the technician will bring the right equipment.
Our collection point is over two hours from Herbeumont. Picking up a unit therefore costs you over four hours there and back, and afterwards you still have to return it. Better to have it delivered: the technician places the dehumidifier, lays the drain hose and collects everything again after the hire period.
Boomsesteenweg 12, Unit 11, 2630 Aartselaar
Mon–Fri 08:00–17:00, by appointment
Sites in the province of Luxembourg, each with photos of the site itself. The same team, the same reading at the start and at handover.
The table helps you plan the hire period. A guide time does not confirm that the material is dry enough. The check before finishing is still needed.
| What needs to dry | Without a dehumidifier | With a Vernast drying package |
|---|---|---|
| Cement screed 5 cm | 6 to 9 weeks | 2 weeks |
| Cement screed 6 cm | 8 to 12 weeks | 3 weeks |
| Cement screed 7 cm | 10 to 15 weeks | 4 weeks |
| Plasterwork 1 cm | 1 to 2 weeks | 2 weeks |
| Plasterwork 2 cm | 2 to 4 weeks | 3 weeks |
| Plasterwork 3 cm | 3 to 6 weeks | 4 weeks |
The table gives guide values for planning. The actual drying time depends on the material and the conditions on site. Before finishing, have the residual moisture checked against the requirements of your floor layer or decorator. For calculated packages, free continued hire applies under the drying guarantee terms. How long screed needs to dry explains it case by case.
We deliver in Herbeumont and the surrounding municipalities. Choose a place below for details on hire and delivery, or see our service area in the province of Luxembourg.
Delivery to Bertrix, Bouillon, Daverdisse and the other places below. Choose your municipality for details on hiring a dehumidifier.
See for each municipality how to hire a construction dehumidifier, what a drying package includes and how to arrange delivery.
From your request to collection. We agree the installation, explain how to use the units and follow the drying process with moisture readings.
Calculate your package online or call us for advice. Give us your site address, your preferred start date and the dimensions of the rooms.
At the agreed time the technician installs the units, connects the condensate drain and explains how to use them.
Use the set-up as the technician explained. Check the condensate drain and report any faults or new moisture problems.
We check the moisture and arrange collection. For calculated packages, free continued hire applies if the drying guarantee terms are met.
Read how customers experience Vernast's delivery, appointments and follow-up. These reviews are about our service across our whole service area.
“Snelle respons en dezelfde dag nog een droger geïnstalleerd. Top service!”
“Zeer goede service en flexibiliteit. Werken zijn uitstekend uitgevoerd. Vriendelijk personeel. Firma zeker aan te raden.”
“We zijn bijzonder tevreden. Het personeel is professioneel én vriendelijk. Het werk is grondig uitgevoerd. Bovendien werd het achteraf goed opgevolgd.”
Our drying experts will help you straight away, with advice tailored to your situation.
Construction moisture after a renovation, yes. If water runs from the slope against the wall after every shower, the moisture keeps coming back. Then you first need drainage or a damp-proof barrier. A moisture reading shows which of the two it is.
Start a few weeks before the first guests arrive. Warm the house up first with a heater, then put a dehumidifier on each floor and keep windows and doors shut. That draws the moisture out of walls and fabrics, and the musty smell is gone before the season starts.
Often, yes, but not every forest track is wide or surfaced enough. Describe the access when you book. Then the technician knows in advance whether he has to cover a stretch on foot, and brings a sack truck for the units.
Warm, moist indoor air condenses on the coldest surface. In a house in the shade of the woods that is often the ceiling under a poorly insulated roof. A dehumidifier lowers the humidity, so less condenses. The mould itself has to be cleaned off first.
Installed and set up by our technician, with a moisture reading at the start and at handover. Prefer to talk it through first? Feel free to call us.

Briefly describe what needs to dry and how big the room is. A drying specialist will reply within one working day, with a proposal for the right package.