Turboflow radial fan
For the new screed in a home in the valley: it blows low across the floor and draws the water out evenly.
View this unitMost people know Brugelette from Pairi Daiza, the animal park on the grounds of the old abbey of Cambron. The municipality itself is rural and includes the villages of Attre, Gages, Mévergnies and Cambron-Casteau. In Attre there is a castle you can visit.
BrugeletteThe right price starts with what needs to dry. For a whole house, wet screed or plasterwork you calculate a complete drying package; for a single room, a single unit may be suitable. Delivery in Brugelette is included in your drying package.
You hire a drying package calculated on the volume, the material and the temperature of your site. The price is known in advance and covers delivery, installation, the moisture reading at the start and at handover, and collection. Not dry within the calculated period? Then the hire continues free of charge, under the terms.

You don't need to combine units yourself. We calculate your drying package based on the floor area, the material and the layer thickness. You see the package price in advance, including delivery to postcode 7940, installation, readings before and after, and collection.
A calculated set-up for your floor, matched to the thickness of the screed. The final reading helps you and your floor layer decide when finishing can start.
More about this dryingConstruction dehumidifiers and fans for even drying throughout the house. We choose the capacity and spread the units over the rooms.
More about this dryingA leak or a flood? Have the cause repaired and standing water removed first. We assess the wet materials and match the drying to them.
More about this drying100% drying guarantee included. Is the material still not dry within the calculated period, despite correct drying conditions? Then you keep hiring the units free of charge, under our drying guarantee terms. This applies to calculated packages that we deliver and install; single units for collection are not covered.
No deposit. The calculator shows your total price and the extras you choose yourself, such as a condensate pump, extra heating or an official moisture report.
The Western Dender flows through the municipality. The villages lie partly in the valley and partly on the fields above, with farmhouses, old village homes and a few recent housing estates. It takes us just over an hour to drive there.
Down in the Dender valley, homes stand on wet ground. A cellar or a ground floor without floor insulation feels chilly and damp there all year round. If the floor is opened up during a renovation anyway, that is the moment to dry the new screed in a controlled way before tiles or parquet go on it.
Higher up, between the villages, people often convert a farmhouse in phases: first the house, later the stable or the barn. Each part has its own drying time. The technician measures room by room, so the finishing does not have to wait for the slowest part.


For the new screed in a home in the valley: it blows low across the floor and draws the water out evenly.
View this unit
For the farmhouse itself, one per floor: 70 litres a day.
View this unit
For the stable or barn that comes last: 110 litres a day in a large volume.
View this unit
For a cold ground floor in winter: this 20 kW heater on 400 V warms the room up first.
View this unitWe drive just over an hour, via the A8 through Ath. You choose a delivery date when you book and we agree the time with you. On a farm with an inner courtyard, it is best to let us know in advance where the technician can unload. He installs the units, measures the moisture in the screed and sets the humidistat.
Aartselaar is just over an hour's drive from Brugelette. Collecting and returning means a round trip twice. For a screed or a farmhouse, you are better off choosing delivery, with the moisture reading included.
Boomsesteenweg 12, Unit 11, 2630 Aartselaar
Mon–Fri 08:00–17:00, by appointment
Sites in Hainaut, each with photos of the site itself. The same team, the same reading at the start and at handover.
The table helps you plan the hire period. A guide time does not confirm that the material is dry enough. The check before finishing is still needed.
| What needs to dry | Without a dehumidifier | With a Vernast drying package |
|---|---|---|
| Cement screed 5 cm | 6 to 9 weeks | 2 weeks |
| Cement screed 6 cm | 8 to 12 weeks | 3 weeks |
| Cement screed 7 cm | 10 to 15 weeks | 4 weeks |
| Plasterwork 1 cm | 1 to 2 weeks | 2 weeks |
| Plasterwork 2 cm | 2 to 4 weeks | 3 weeks |
| Plasterwork 3 cm | 3 to 6 weeks | 4 weeks |
The table gives guide values for planning. The actual drying time depends on the material and the conditions on site. Before finishing, have the residual moisture checked against the requirements of your floor layer or decorator. For calculated packages, free continued hire applies under the drying guarantee terms. How long screed needs to dry explains it case by case.
We deliver in Brugelette and the surrounding municipalities. Choose a place below for details on hire and delivery, or see our service area in Hainaut.
Delivery to Ath, Belœil, Bernissart and the other places below. Choose your municipality for details on hiring a dehumidifier.
See for each municipality how to hire a construction dehumidifier, what a drying package includes and how to arrange delivery.
From your request to collection. We agree the installation, explain how to use the units and follow the drying process with moisture readings.
Calculate your package online or call us for advice. Give us your site address, your preferred start date and the dimensions of the rooms.
At the agreed time the technician installs the units, connects the condensate drain and explains how to use them.
Use the set-up as the technician explained. Check the condensate drain and report any faults or new moisture problems.
We check the moisture and arrange collection. For calculated packages, free continued hire applies if the drying guarantee terms are met.
Read how customers experience Vernast's delivery, appointments and follow-up. These reviews are about our service across our whole service area.
“Snelle respons en dezelfde dag nog een droger geïnstalleerd. Top service!”
“Zeer goede service en flexibiliteit. Werken zijn uitstekend uitgevoerd. Vriendelijk personeel. Firma zeker aan te raden.”
“We zijn bijzonder tevreden. Het personeel is professioneel én vriendelijk. Het werk is grondig uitgevoerd. Bovendien werd het achteraf goed opgevolgd.”
Our drying experts will help you straight away, with advice tailored to your situation.
For construction moisture after a renovation, yes: that goes away for good. If the cellar or the ground floor is damp because of a high water table, a dehumidifier keeps the room usable while it runs. The reading at delivery shows which of the two applies to you.
Yes. You book a drying package per phase, and the technician sets up the units each time in the part that has just been finished. That way you do not hire units for a space nobody is working on yet.
As soon as the residual moisture is below the value given by the tiler or the adhesive manufacturer. On a cold, wet base that takes longer than in a new build. We measure it, so you can go to your tiler with a figure.
In the cold months, almost always. Below 15 °C the efficiency of a condensation dehumidifier drops sharply, and an old farmhouse without heating rarely reaches that temperature in winter. An electric heater brings the room up to temperature first.
Installed and set up by our technician, with a moisture reading at the start and at handover. Prefer to talk it through first? Feel free to call us.

Briefly describe what needs to dry and how big the room is. A drying specialist will reply within one working day, with a proposal for the right package.