Drying a new build in Putte

Construction drying · Putte · Construction dehumidifier hire in the province of Antwerp

After the plastering and screeding, the new build was still full of construction moisture, with sharply raised humidity as a result. Vernast brought that moisture down to a safe level quickly and in a controlled way with professional construction dehumidifiers and fans, so the finishing could start without risk of mould or cracking.

The newly built house in Putte where Vernast dried out the construction moisture
Treatment
Construction drying+ moisture control
Diagnosis
Construction moistureafter plastering and screeding
Active drying
3 daysconstruction dehumidifiers + fans
Climate recovery
4 dayscontrolled down to the target value
The project

The situation on arrival in Putte

In this newly built house in Putte, the plastering and screeding had just been completed. Wet trades like these bring hundreds of litres of water into the building, pushing the humidity up sharply. Without timely action, that construction moisture threatens to cause mould, cracking and delays to the remaining finishing.

  • Sharply raised humidity from the plastering and screeding
  • High moisture values in the screed, walls and ceilings
  • Risk of mould growth and cracks if finished too soon
  • A tight build schedule waiting on a dry base

Our diagnosis

On arrival, Vernast took moisture readings at several points: on the screed, in the walls and on the ceilings. Those readings confirmed a classic case of construction moisture after wet trades. This is not a structural moisture problem, but excess water that still has to leave the building. The challenge is to remove that moisture quickly and in a controlled way, so the house is not damaged and the schedule is not put at risk.

The work, step by step

Analysis and advice, day 1. Based on the moisture readings and the building volume, Vernast determined the right combination and placement of construction dehumidifiers and fans. That way every room dries evenly, without pockets of moisture.

Active drying, 3 days. Professional construction dehumidifiers extract the moisture from the air, while fans keep the air moving through the house. The moisture content in the screed, walls and ceilings fell quickly and steadily towards a safe level.

Climate recovery, 4 days. The indoor climate was then stabilised further and monitored with check readings until the target values were reached. Only then is the house ready to be finished without risk.

Behind the scenes

The project in pictures

From the first moisture readings to the running construction dehumidifiers and the final climate. Browse with the arrows or pick an image below.

The newly built house in Putte at the start of the construction drying
1 / 19The newly built house in Putte at the start of the construction drying
Construction dehumidifiers and fans set up in the empty living area
2 / 19Construction dehumidifiers and fans set up in the empty living area
Bare screed and large glazing, ready to dry
3 / 19Bare screed and large glazing, ready to dry
Fresh plasterwork with a damp line along the ceiling
4 / 19Fresh plasterwork with a damp line along the ceiling
Damp patches in the plasterwork just after the wet trades
5 / 19Damp patches in the plasterwork just after the wet trades
The construction dehumidifier keeps running in a controlled way into the evening
6 / 19The construction dehumidifier keeps running in a controlled way into the evening
Plastered living area, ready for the drying process
7 / 19Plastered living area, ready for the drying process
Moisture reading on the wall with a sharply raised starting value
8 / 19Moisture reading on the wall: a sharply raised starting value
Drying set-up with construction dehumidifier and extra air circulation
9 / 19Drying set-up with construction dehumidifier and extra air circulation
White construction dehumidifier at work in the open living area
10 / 19White construction dehumidifier at work in the open living area
Moisture reading of the screed at the window opening
11 / 19Moisture reading of the screed at the window opening
Checking the moisture content in the screed
12 / 19Checking the moisture content in the screed
High moisture value measured in a recess in the bare structure
13 / 19High moisture value measured in a recess in the bare structure
Reading in the wall recess showing the remaining construction moisture
14 / 19Reading in the wall recess shows the remaining construction moisture
Checking the ceiling moisture after a few days of drying
15 / 19Checking the ceiling moisture after a few days of drying
Falling moisture value on the ceiling during drying
16 / 19Falling moisture value on the ceiling during drying
Plastered living area with arched window, ready for finishing
17 / 19Plastered living area with arched window, ready for finishing
The finished façade of the new build in Putte
18 / 19The finished façade of the new build in Putte
The rear of the house during the last days on site
19 / 19The rear of the house during the last days on site
The result

From a damp shell to a dry base

Why clients choose us

Speed and control in one approach

Construction drying is all about timing. We combine the right dryers and ventilation with monitoring through moisture readings, carried out by our own team of Vernast-certified moisture experts. That way you don't lose valuable weeks on site and you avoid damage afterwards.

After the work

Ready to finish without risk

With the construction moisture brought back to the target values, the house in Putte could be finished safely, with no danger of mould or cracking. This project shows how timely, controlled drying lays the foundation for a durable and healthy end result.