Drying plasterwork in Berchem

Construction drying · Berchem · Construction dehumidifier hire in the province of Antwerp

After the plastering work, too much residual moisture remained in the walls of this home in Berchem. We immediately deployed targeted construction drying, combined it with mould treatment and kept a close eye on the indoor climate. The moisture was removed safely, without damage to the finish or delays to the schedule.

Town house in Berchem where Vernast treated the moisture after the plastering work
Treatment
Mould treatment+ targeted construction drying
Analysis & solution
24 hoursmoisture reading and approach decided
Mould treatment
3 working daysmoisture-sensitive areas treated
Climate recovery
4 working dayscontrolled drying
The project

The situation on arrival in Berchem

In this characterful town house, the plastering had just been completed when a check revealed a raised moisture content in the walls. Fresh plasterwork brings in a lot of construction moisture, and without targeted follow-up that residual moisture causes problems for both the finishing and the schedule. Speed was the key here.

  • Raised moisture content in the fresh plasterwork after the work
  • Real risk of mould growth on the damp sections of wall
  • Threatened delay to the further finishing of the home
  • Uncontrolled drying with a risk of cracks and moisture damage

Our diagnosis

A thorough inspection with moisture readings at different heights confirmed the picture: construction moisture from the fresh plasterwork that was not escaping quickly enough. As long as that residual moisture stays in the walls, it creates an ideal breeding ground for mould, and the finish risks being applied too early over a damp substrate. The solution therefore lay not in waiting, but in controlled, measured drying.

The work, step by step

Analysis & solution, within 24 hours. Straight after the assessment, we mapped the moisture content and determined the right set-up of construction dehumidifiers and air circulation for this space.

Mould treatment, 3 working days. The moisture-sensitive areas were treated, so early mould had no chance and the walls could continue drying in a healthy state.

Climate recovery, 4 working days. With a well-planned set-up of construction dehumidifiers and air circulation, the moisture content was brought back to a healthy level in a controlled way, monitored each time with climate and moisture readings.

A worry-free move to the finishing stage. Once the readings gave the green light, the home could safely be finished, without the risk of cracks or mould and without losing valuable building time.

Behind the scenes

The project in pictures

From the first moisture reading to a dried-out, healthy base. Browse with the arrows or pick a step below.

Town house in Berchem at the start of the drying work
1 / 19The home in Berchem at the start of the drying work
Fresh plasterwork with high residual moisture
2 / 19Fresh plasterwork with high residual moisture
Moisture reading at different heights in the wall
3 / 19Moisture reading at different heights in the wall
Visible damp patches on the new plasterwork
4 / 19Visible damp patches on the new plasterwork
Inspecting the moisture-sensitive sections of wall
5 / 19Inspecting the moisture-sensitive sections of wall
Overview of the room before active drying
6 / 19Overview of the room before active drying
Construction dehumidifiers set up in the living space
7 / 19Construction dehumidifiers set up in the living space
Dehumidifier placed for controlled drying
8 / 19Dehumidifier placed for controlled drying
Construction dehumidifier at work on the residual moisture
9 / 19Construction dehumidifier at work on the residual moisture
Air circulation started up in the room
10 / 19Air circulation started up in the room
Checking the drying process with measuring equipment
11 / 19Checking the drying process with measuring equipment
Treating the mould-prone areas
12 / 19Treating the mould-prone areas
Mould treatment of the damp sections of wall
13 / 19Mould treatment of the damp sections of wall
Aftercare of the treated surface
14 / 19Aftercare of the treated surface
Tracking the moisture content during drying
15 / 19Tracking the moisture content during drying
Climate reading while restoring the indoor climate
16 / 19Climate reading while restoring the indoor climate
The room after the mould treatment
17 / 19The room after the mould treatment
Dried-out plasterwork ready for finishing
18 / 19Dried-out plasterwork, ready for finishing
A healthy, dry base once the work was completed
19 / 19A healthy, dry base once the work was completed
The result

From damp plasterwork to a dry, healthy base

Why customers choose us

Quick to act, with our own equipment and measurements

Because we could step in immediately with our own construction dehumidifiers and measuring equipment, the damp problem was limited to a short phase. Our Vernast-certified moisture experts combined drying and mould treatment in one smooth approach, so the customer never pays twice for the same problem.

After the work

Ready for worry-free finishing

With the residual moisture removed in a controlled way and the mould-prone areas treated, the home in Berchem could safely be finished. This project shows how a fast diagnosis and measured drying prevent both damage and delays, and lay the foundation for an indoor climate that stays healthy.