Drying construction moisture in Wintam
Construction drying · Wintam · Construction dehumidifier hire in the province of AntwerpAfter the plastering and screed work, this home in Wintam held a lot of construction moisture in its walls and floors. Vernast deployed professional construction dehumidifiers and fans and tracked the drying process with moisture readings, so the home dried in a controlled way and without delay, ready for further finishing.

The situation on arrival
The home in Wintam had just been given new plasterwork and a fresh screed. Together, those wet trades bring hundreds of litres of water into the building, which drives the humidity up sharply. Without a targeted approach, that construction moisture would stay in the structure for weeks, with a risk of condensation, mould and delays to the schedule.
- Sharply raised humidity after the plastering and screed work
- High moisture levels in the fresh screed and plasterwork
- Risk of condensation and mould as long as the moisture is not removed
- Threatened delay before floors and finishes could be installed
Our diagnosis
With a moisture meter we checked the moisture levels in different places: the screed still showed high readings and the fresh plasterwork peaked at above 80. The picture was clear: this is construction moisture after wet trades, not a structural damp problem. The structure simply needs to release that excess water in a controlled way before the finishing work starts.
The work, step by step
Setting up the drying units. In every room, Vernast placed powerful condensation construction dehumidifiers, supported by fans that keep the damp air moving and direct it across all surfaces.
Controlled drying. The construction dehumidifiers continuously extract water from the air, while the fans speed up drying in the walls, the screed and under the roof. The humidity falls evenly, without cracking from drying too fast.
Follow-up with moisture readings. During the four days of climate recovery, we tracked the moisture levels until a stable, safe level was reached throughout the home.
Ready for finishing. With the construction moisture gone, the further finishing could go ahead without delay, and the risk of later condensation and mould problems was ruled out.
The project in pictures
From the first moisture readings to the full drying set-up with construction dehumidifiers and fans. Browse with the arrows or pick an image below.

















From a saturated shell to a dry, stable home
Speed without forcing the structure
With professional drying equipment and the right follow-up, we get rid of construction moisture quickly, but always in a controlled way. That way you avoid delays to the schedule as well as cracking or mould from drying too abruptly or too slowly, all carried out by our own team of Vernast experts.
Ready for further finishing
At handover, the walls, screed and roof space had been brought back to a stable moisture level, confirmed with moisture readings. The home in Wintam could be finished straight away, with a healthy indoor climate as its starting point.