Drying a new build in Kontich

Construction drying · Kontich · Construction dehumidifier hire in the province of Antwerp

In this new-build home in Kontich, fresh plastering and screed work had pushed the humidity up sharply. Vernast brought the construction moisture down quickly and in a controlled way with professional construction dehumidifiers and ventilation, combined with mould treatment, so the finishing work could start without risk.

New-build home in Kontich where Vernast dried out the construction moisture
Treatment
Construction drying+ mould treatment
Analysis & solution
24 hreadings and drying plan
Mould treatment
3 daysaffected areas treated
Climate recovery
4 daysdrying to a safe level
The project

The situation after the shell stage

When the shell in Kontich was finished, the home was still full of construction moisture. Fresh plasterwork and a newly poured screed release moisture for months, and as long as ventilation is limited, that moisture hangs in the air. The result is high humidity that slows down the further finishing and increases the risk of mould.

  • Sharply raised humidity from fresh plaster and screed work
  • Slow natural drying because ventilation was still limited
  • Increased risk of mould growth before the finishing work
  • Damp screed that would delay the laying of floors

Our diagnosis

On arrival, we mapped the indoor climate by measuring the humidity and the moisture content of the screed in several places around the home. The picture was clear: not a structural damp problem, but construction moisture that still had to escape. Without targeted drying, that process takes too long and gives mould the chance to take hold. The solution was therefore a controlled drying and ventilation plan.

The work, step by step

Analysis and drying plan. Within 24 hours we recorded the readings and drew up a drying plan with the right positioning of construction dehumidifiers and fans for each room.

Mould treatment, 3 days. The areas where mould was already starting to form were thoroughly treated, so the home could continue drying from a clean base.

Construction drying and ventilation. With professional construction dehumidifiers and fans, the damp air was removed continuously and the moisture content steadily brought back to a safe level.

Climate recovery, 4 days. During the drying period we tracked the humidity until the home was dry and stable, ready for finishing without the risk of damp problems.

Behind the scenes

The project in pictures

From the damp shell and the readings to the drying living spaces. Browse with the arrows or pick an image below.

Unfinished living area in Kontich with fresh screed and plasterwork
1 / 16Unfinished living area with fresh screed, ready to dry
Upper floor under the sloping roof after the plastering work
2 / 16Upper floor under the sloping roof after the plastering work
Room under the roof with a roof window in the new-build home
3 / 16Room under the roof with a roof window
Measuring the air humidity with the hygrometer
4 / 16Measuring the air humidity with the hygrometer
Exposed roof insulation during the shell stage
5 / 16Exposed roof insulation during the shell stage
Bright room with fresh plasterwork and drying screed
6 / 16Bright room with fresh plasterwork and drying screed
Ventilation ducts in the central hall of the home
7 / 16Ventilation ducts in the central hall
Plant room with ventilation connection
8 / 16Plant room with ventilation connection
Shell detail with a concrete element in the room
9 / 16Shell detail with a concrete element
Checking the moisture content in the room
10 / 16Checking the moisture content in the room
Living area with exposed roof trusses and a large expanse of glazing
11 / 16Living area with exposed roof trusses and a large expanse of glazing
Doorway to the adjoining room during drying
12 / 16Doorway to the adjoining room
The new-build home in Kontich from outside during the work
13 / 16The home from outside during the work
Front view of the new-build home in Kontich
14 / 16Front view of the home in Kontich
Side elevation of the home at dusk
15 / 16Side elevation of the home at dusk
Finished home at sunset
16 / 16The home at sunset after the work
The result

From a damp shell to a dry, healthy base

Why customers choose us

Dry fast, without construction delays

With a targeted drying and ventilation plan, we bring construction moisture down much faster than natural drying would. That keeps the schedule for your finishing work on track and prevents mould before it can form, all carried out by our own team of Vernast-certified moisture experts.

After the work

Ready for healthy finishing

With the construction moisture at a safe level and the affected areas treated, the home in Kontich can be finished without worries. This project shows how timely readings and targeted construction drying lay the foundation for an indoor climate that stays dry and healthy.