Drying a new build in Kontich
Construction drying · Kontich · Construction dehumidifier hire in the province of AntwerpIn this new-build home in Kontich, fresh plastering and screed work had pushed the humidity up sharply. Vernast brought the construction moisture down quickly and in a controlled way with professional construction dehumidifiers and ventilation, combined with mould treatment, so the finishing work could start without risk.

The situation after the shell stage
When the shell in Kontich was finished, the home was still full of construction moisture. Fresh plasterwork and a newly poured screed release moisture for months, and as long as ventilation is limited, that moisture hangs in the air. The result is high humidity that slows down the further finishing and increases the risk of mould.
- Sharply raised humidity from fresh plaster and screed work
- Slow natural drying because ventilation was still limited
- Increased risk of mould growth before the finishing work
- Damp screed that would delay the laying of floors
Our diagnosis
On arrival, we mapped the indoor climate by measuring the humidity and the moisture content of the screed in several places around the home. The picture was clear: not a structural damp problem, but construction moisture that still had to escape. Without targeted drying, that process takes too long and gives mould the chance to take hold. The solution was therefore a controlled drying and ventilation plan.
The work, step by step
Analysis and drying plan. Within 24 hours we recorded the readings and drew up a drying plan with the right positioning of construction dehumidifiers and fans for each room.
Mould treatment, 3 days. The areas where mould was already starting to form were thoroughly treated, so the home could continue drying from a clean base.
Construction drying and ventilation. With professional construction dehumidifiers and fans, the damp air was removed continuously and the moisture content steadily brought back to a safe level.
Climate recovery, 4 days. During the drying period we tracked the humidity until the home was dry and stable, ready for finishing without the risk of damp problems.
The project in pictures
From the damp shell and the readings to the drying living spaces. Browse with the arrows or pick an image below.
















From a damp shell to a dry, healthy base
Dry fast, without construction delays
With a targeted drying and ventilation plan, we bring construction moisture down much faster than natural drying would. That keeps the schedule for your finishing work on track and prevents mould before it can form, all carried out by our own team of Vernast-certified moisture experts.
Ready for healthy finishing
With the construction moisture at a safe level and the affected areas treated, the home in Kontich can be finished without worries. This project shows how timely readings and targeted construction drying lay the foundation for an indoor climate that stays dry and healthy.