Construction drying Plasterwork Mould removal

Drying a new-build villa in Schilde

Construction drying · Schilde · Construction dehumidifier hire in the province of Antwerp

In this new-build villa in Schilde, the fresh plasterwork caused a high level of construction moisture. With professional construction drying and targeted air circulation, Vernast brought the moisture down quickly, so the painting and floor finishing could start without risk of stains or shrinkage cracks, and the building schedule stayed perfectly on track.

New-build villa in Schilde where Vernast tackled the construction moisture with professional construction drying
Treatment
Construction dryingafter the plasterwork
Analysis & Solution
24 hmoisture reading and plan
Mould removal
3 dkept dry as prevention
Climate recovery
4 dhealthy indoor climate
The project

The situation after plastering

In a new-build home, fresh plasterwork brings large quantities of water into the structure. In this villa in Schilde, the moisture level after plastering was too high to continue finishing straight away. Without intervention, natural drying would take weeks and throw the tight building schedule off course.

  • Sharply increased construction moisture in the fresh plasterwork
  • Risk of shrinkage cracks and stains if painted too soon
  • Not enough natural ventilation to remove the moisture
  • A tight building schedule that left no time for slow drying

Our diagnosis

Moisture readings at different heights confirmed the picture: this was not rising or penetrating damp, but construction moisture. That is the excess mixing water from plaster, screed and concrete that still has to leave the structure after the shell is built. In a well-insulated, airtight new-build villa, that moisture does not disappear on its own: without active drying it stays in the walls and slows down the entire finishing process.

The work, step by step

Analysis and plan (24 h). After a thorough moisture measurement, Vernast determined the number and layout of the construction dehumidifiers, matched to the volume and layout of the villa.

Construction drying. Powerful dehumidifiers and fans were spread strategically across the rooms. This drew the moisture out of the plasterwork and continuously removed the humid air, with the readings monitored daily.

Mould removal (3 d). By keeping the rooms dry, mould had no chance to take hold in the damp plasterwork, a preventive step that avoids problems later on.

Climate recovery (4 d). Once the moisture level was at a healthy level, the indoor climate was stabilised. The walls were dry and even, ready for flawless painting and floor finishing.

Behind the scenes

The project in pictures

From the first moisture reading to a dry villa in Schilde, ready for finishing. Browse with the arrows or pick an image below.

New-build villa in Schilde ready for the drying phase
1 / 20The new-build villa ready for the drying phase
Fresh plasterwork with a high level of construction moisture
2 / 20Fresh plasterwork with a high level of construction moisture
Construction dehumidifier set up in the living area of the villa
3 / 20Construction dehumidifier set up in the living area
Dehumidifier running during construction drying
4 / 20Dehumidifier running
Targeted air circulation along the plastered walls
5 / 20Targeted air circulation along the walls
Moisture measurement of the plasterwork in the villa
6 / 20Moisture measurement of the plasterwork
Daily monitoring of the moisture level
7 / 20Daily monitoring of the moisture level
Drying the plastered walls on the ground floor
8 / 20Drying the plastered walls
Construction dehumidifiers spread across the different rooms
9 / 20Construction dehumidifiers spread across the rooms
Checking the indoor climate during drying
10 / 20Checking the indoor climate
Humid air is continuously removed from the structure
11 / 20Moisture removal from the structure
Dry, even plastered walls after the treatment
12 / 20Dry, even walls after treatment
Checking corners and junctions for residual moisture
13 / 20Checking corners and junctions
Measurement confirms the falling moisture level
14 / 20Measurement confirms the falling moisture level
Room ready for further finishing
15 / 20Room ready for finishing
Overview of the treated living area in the villa
16 / 20Overview of the treated living area
Detail of the dried plasterwork
17 / 20Detail of the dried plasterwork
Result: a healthy, dry indoor climate in Schilde
18 / 20A healthy, dry indoor climate
Finished room after the drying period
19 / 20Finished room after the drying period
End result of the construction drying, ready to move in
20 / 20End result, ready to move in
The result

From wet construction moisture to a villa ready for finishing

Why clients choose us

Speed without compromising on quality

With professional construction drying, we remove the moisture from the structure in days rather than weeks, carried out by our own team of Vernast-certified moisture experts. That keeps the building schedule on track and lets the finishing start on a dry, reliable surface.

After the works

Ready for a flawless finish

With the construction moisture at a healthy level and the indoor climate stabilised, the painting and floor finishing could start straight away. This project in Schilde shows how a correct diagnosis and a well-considered drying approach lay the foundation for a durable, flawless end result.