Drying a new-build villa in Schilde
Construction drying · Schilde · Construction dehumidifier hire in the province of AntwerpIn this new-build villa in Schilde, the fresh plasterwork caused a high level of construction moisture. With professional construction drying and targeted air circulation, Vernast brought the moisture down quickly, so the painting and floor finishing could start without risk of stains or shrinkage cracks, and the building schedule stayed perfectly on track.

The situation after plastering
In a new-build home, fresh plasterwork brings large quantities of water into the structure. In this villa in Schilde, the moisture level after plastering was too high to continue finishing straight away. Without intervention, natural drying would take weeks and throw the tight building schedule off course.
- Sharply increased construction moisture in the fresh plasterwork
- Risk of shrinkage cracks and stains if painted too soon
- Not enough natural ventilation to remove the moisture
- A tight building schedule that left no time for slow drying
Our diagnosis
Moisture readings at different heights confirmed the picture: this was not rising or penetrating damp, but construction moisture. That is the excess mixing water from plaster, screed and concrete that still has to leave the structure after the shell is built. In a well-insulated, airtight new-build villa, that moisture does not disappear on its own: without active drying it stays in the walls and slows down the entire finishing process.
The work, step by step
Analysis and plan (24 h). After a thorough moisture measurement, Vernast determined the number and layout of the construction dehumidifiers, matched to the volume and layout of the villa.
Construction drying. Powerful dehumidifiers and fans were spread strategically across the rooms. This drew the moisture out of the plasterwork and continuously removed the humid air, with the readings monitored daily.
Mould removal (3 d). By keeping the rooms dry, mould had no chance to take hold in the damp plasterwork, a preventive step that avoids problems later on.
Climate recovery (4 d). Once the moisture level was at a healthy level, the indoor climate was stabilised. The walls were dry and even, ready for flawless painting and floor finishing.
The project in pictures
From the first moisture reading to a dry villa in Schilde, ready for finishing. Browse with the arrows or pick an image below.




















From wet construction moisture to a villa ready for finishing
Speed without compromising on quality
With professional construction drying, we remove the moisture from the structure in days rather than weeks, carried out by our own team of Vernast-certified moisture experts. That keeps the building schedule on track and lets the finishing start on a dry, reliable surface.
Ready for a flawless finish
With the construction moisture at a healthy level and the indoor climate stabilised, the painting and floor finishing could start straight away. This project in Schilde shows how a correct diagnosis and a well-considered drying approach lay the foundation for a durable, flawless end result.