Drying plasterwork in Merksem

Construction drying · Merksem · Construction dehumidifier hire in the province of Antwerp

After plastering, the walls still hold a lot of construction moisture. In this home in Merksem, the client called in Vernast to remove that moisture quickly and safely with professional construction dehumidifiers and targeted ventilation. That kept cracking and mould at bay, and the finishing work could carry on straight away.

The home in Merksem where Vernast dried the fresh plasterwork in a controlled way
Treatment
Construction drying+ mould prevention
Analysis & approach
24 hourson-site moisture reading
Drying phase
3 dayspowerful construction dehumidifiers
Climate recovery
4 dayscontrolled drying
The project

Fresh plasterwork dried safely in Merksem

In this home in Merksem, all the interior plasterwork had just been applied. Fresh plaster contains a large amount of construction moisture that has to evaporate in a controlled way. If a home dries too quickly or too unevenly, cracks appear; if it dries too slowly, mould and musty smells get free rein. Vernast was brought in to keep a close eye on that drying phase.

  • High residual moisture in the newly applied plasterwork
  • Sharply increased humidity in the closed rooms
  • Risk of cracking and mould with uncontrolled drying
  • Further finishing could only start once everything was fully dry

Our diagnosis

Moisture readings at several points showed us the residual moisture in the walls and the humidity in the home. As expected after fresh plastering, the values were well above the desired level. The conclusion was clear: this was not a structural damp problem, but construction moisture that had to be removed in a controlled way. Without active drying, natural evaporation would drag on for weeks, with a risk of cracking and mould as a result.

The work, step by step

Measuring and setting up. Based on the volume and the moisture values, we decided how many construction dehumidifiers and fans to use and where to place them, so that humid air was removed everywhere and the airflow reached every wall.

Controlled drying. The powerful construction dehumidifiers drew the excess moisture out of the air, while the ventilation ensured even circulation. This brought the moisture level down quickly and without putting stress on the plasterwork.

Monitoring and adjusting. During the drying phase we checked the climate and moisture values and adjusted the setup where needed, until a stable and safe level was reached.

Ready for finishing. With a dry, stable surface, the painting and finishing work could continue without delay. No cracks, no mould, no musty smell, but a healthy base to build on.

Behind the scenes

The project in pictures

From the home in Merksem to the fresh plasterwork drying in a controlled way. Browse with the arrows or pick an image below.

The home in Merksem with a material hoist during the works
1 / 11The home in Merksem with a material hoist during the works
Basement wall with fresh cement render, ready to dry
2 / 11Basement wall with fresh cement render, ready to dry
Freshly plastered living area on the screed in Merksem
3 / 11Freshly plastered living area on the screed
Plastered walls waiting for controlled drying
4 / 11Plastered walls waiting for the drying treatment
View of the home in Merksem with the construction drying setup
5 / 11View of the home with the construction drying setup
Spacious living area with fresh plasterwork and screed
6 / 11Spacious living area with fresh plasterwork and screed
A fresh coat of plaster across the entire floor
7 / 11A fresh coat of plaster across the entire floor
Interior in Merksem during the drying phase of the plasterwork
8 / 11Interior during the drying phase of the plasterwork
Plasterwork drying evenly in the home
9 / 11Plasterwork drying evenly in the home
Shell construction phase with services before finishing
10 / 11Shell construction phase with services before finishing
The home in Merksem, ready for further finishing
11 / 11The home in Merksem, ready for further finishing
The result

From damp construction moisture to a dry, stable base

Why clients choose us

Fast drying without damage or delay

Our construction dehumidifiers and ventilation are matched to the volume and moisture level of each home. That way we remove construction moisture in a controlled way, without forcing cracks and without your building project falling behind schedule.

After the works

Ready for finishing straight away

With the plasterwork dry and the indoor climate stable, the home in Merksem could be finished without risk. This project shows how a correct diagnosis and active drying prevent mould, odour nuisance and repair costs.