Revolution desiccant dehumidifier
For a site that cannot be heated. This desiccant dehumidifier keeps absorbing moisture even in cold rooms and dries through hoses.
View this unitRamillies lies in the far east of Walloon Brabant, against the provinces of Namur and Liège. The municipality includes Bomal, Gérompont, Grand-Rosière-Hottomont, Huppaye, Mont-Saint-André and Offus, among others. It is open farmland with large farmhouses.
RamilliesThe right price starts with what needs to dry. For a whole house, wet screed or plasterwork you calculate a complete drying package; for a single room, a single unit may be suitable. Delivery in Ramillies is included in your drying package.
You hire a drying package calculated on the volume, the material and the temperature of your site. The price is known in advance and covers delivery, installation, the moisture reading at the start and at handover, and collection. Not dry within the calculated period? Then the hire continues free of charge, under the terms.

You don't need to combine units yourself. We calculate your drying package based on the floor area, the material and the layer thickness. You see the package price in advance, including delivery to postcode 1367, installation, readings before and after, and collection.
A calculated set-up for your floor, matched to the thickness of the screed. The final reading helps you and your floor layer decide when finishing can start.
More about this dryingConstruction dehumidifiers and fans for even drying throughout the house. We choose the capacity and spread the units over the rooms.
More about this dryingA leak or a flood? Have the cause repaired and standing water removed first. We assess the wet materials and match the drying to them.
More about this drying100% drying guarantee included. Is the material still not dry within the calculated period, despite correct drying conditions? Then you keep hiring the units free of charge, under our drying guarantee terms. This applies to calculated packages that we deliver and install; single units for collection are not covered.
No deposit. The calculator shows your total price and the extras you choose yourself, such as a condensate pump, extra heating or an official moisture report.
From Aartselaar we are about an hour and a quarter on the road to Ramillies. We deliver to all the villages, on a day and at a time we agree together.
In the open landscape, a site in winter is exposed to the wind, and an empty house without heating cools down quickly. A condensation dehumidifier then extracts little water from the air. An electric site heater first brings the room up to temperature, and then the dehumidifier does its work. If heating is not possible, a desiccant dehumidifier is the alternative.
Converting a farmhouse brings a lot of water into the building: new screed, plasterwork and sometimes a new concrete floor. In such a large volume, it is best to use a large dehumidifier, with a fan that circulates the air.


For a site that cannot be heated. This desiccant dehumidifier keeps absorbing moisture even in cold rooms and dries through hoses.
View this unit
For a cold site in winter. This site heater gives 30 kW of heat on three-phase power (400 V). Check beforehand that your site distribution board has that connection.
View this unit
For the large spaces of a converted farmhouse: up to 110 litres a day, in volumes up to about 600 m³.
View this unit
This fan moves 4,500 m³ of air an hour and spreads the warm, dry air through the whole room.
View this unitWe drive about an hour and a quarter from Aartselaar to Ramillies. When you book, you choose the delivery day, and we agree the time with you by phone. The technician sets up the heater and the dehumidifiers, checks the connection and measures the moisture. Delivery, installation and collection are included in your drying package.
You can collect by appointment in Aartselaar, Boomsesteenweg 12, unit 11. From Ramillies the drive takes about an hour and a quarter, and you make the trip when collecting and again when returning. A site heater and a large dehumidifier also need a roomy vehicle. So it is better to have them delivered.
Boomsesteenweg 12, Unit 11, 2630 Aartselaar
Mon–Fri 08:00–17:00, by appointment
Sites in Walloon Brabant, each with photos of the site itself. The same team, the same reading at the start and at handover.
The table helps you plan the hire period. A guide time does not confirm that the material is dry enough. The check before finishing is still needed.
| What needs to dry | Without a dehumidifier | With a Vernast drying package |
|---|---|---|
| Cement screed 5 cm | 6 to 9 weeks | 2 weeks |
| Cement screed 6 cm | 8 to 12 weeks | 3 weeks |
| Cement screed 7 cm | 10 to 15 weeks | 4 weeks |
| Plasterwork 1 cm | 1 to 2 weeks | 2 weeks |
| Plasterwork 2 cm | 2 to 4 weeks | 3 weeks |
| Plasterwork 3 cm | 3 to 6 weeks | 4 weeks |
The table gives guide values for planning. The actual drying time depends on the material and the conditions on site. Before finishing, have the residual moisture checked against the requirements of your floor layer or decorator. For calculated packages, free continued hire applies under the drying guarantee terms. How long screed needs to dry explains it case by case.
We deliver in Ramillies and the surrounding municipalities. Choose a place below for details on hire and delivery, or see our service area in Walloon Brabant.
Delivery to Beauvechain, Chastre, Chaumont-Gistoux and the other places below. Choose your municipality for details on hiring a dehumidifier.
From your request to collection. We agree the installation, explain how to use the units and follow the drying process with moisture readings.
Calculate your package online or call us for advice. Give us your site address, your preferred start date and the dimensions of the rooms.
At the agreed time the technician installs the units, connects the condensate drain and explains how to use them.
Use the set-up as the technician explained. Check the condensate drain and report any faults or new moisture problems.
We check the moisture and arrange collection. For calculated packages, free continued hire applies if the drying guarantee terms are met.
Read how customers experience Vernast's delivery, appointments and follow-up. These reviews are about our service across our whole service area.
“Snelle respons en dezelfde dag nog een droger geïnstalleerd. Top service!”
“Zeer goede service en flexibiliteit. Werken zijn uitstekend uitgevoerd. Vriendelijk personeel. Firma zeker aan te raden.”
“We zijn bijzonder tevreden. Het personeel is professioneel én vriendelijk. Het werk is grondig uitgevoerd. Bovendien werd het achteraf goed opgevolgd.”
Our drying experts will help you straight away, with advice tailored to your situation.
Warm air can hold more moisture than cold air, and a condensation dehumidifier only extracts water from the air well above about 15 °C. In an ice-cold house, heating first brings the moisture into the air, after which the dehumidifier captures it.
No. The 30 kW heater runs on 400 V three-phase power, as does the 20 kW one. Many sites have a site distribution board with such a connection. In an existing house, it is best to have an electrician check what is possible.
Then you choose a desiccant dehumidifier. It also dries in a cold room, without you having to heat it first. Mention it when you book, and we will put together a package without a heater.
Until the moisture reading shows that floor and walls are ready for finishing. In a large conversion with a lot of new screed, that usually takes longer than in a small renovation. If more time is needed, you can extend the hire.
Installed and set up by our technician, with a moisture reading at the start and at handover. Prefer to talk it through first? Feel free to call us.

Briefly describe what needs to dry and how big the room is. A drying specialist will reply within one working day, with a proposal for the right package.