Construction drying Moisture measurement Climate control

Drying an exhibition space in Boom

Construction drying · Boom · Construction dehumidifier hire in the province of Antwerp

In this commercial space in Boom, intended as a venue for exhibition openings and events, the moisture content measured after the plasterwork was too high. Vernast quickly brought the indoor climate back to a safe level with targeted construction drying and precise measurements, so the remaining finishing and fit-out could go ahead without risk.

The new exhibition space in Boom where Vernast carried out the construction drying
Treatment
Construction dryingafter the plasterwork
Analysis & solution
24 hoursmoisture reading + drying plan
Mould treatment
3 working dayspreventive treatment
Climate recovery
4 working dayscontrolled drying
The project

The situation on arrival

The space in Boom was being prepared as an atmospheric venue for exhibition openings and events, with art and experience at its heart. Just after the plasterwork, however, the moisture content in the walls and the air turned out to be too high. As long as that construction moisture was not under control, the schedule was at risk of delay and the finishes, the installations and the works on display were at risk of damage.

  • Moisture content too high in the fresh plasterwork
  • Raised relative humidity throughout the entire space
  • Risk of damage to finishes, installations and artworks
  • Looming delay to the finishing and fit-out

Our diagnosis

Moisture readings at several points showed that this was construction moisture after the plasterwork: the fresh plaster and the air still held too much residual moisture. In a commercial space with a tight handover date, natural drying is too slow and too unpredictable. To avoid damage and delay, targeted construction drying with continuous monitoring was needed.

The work, step by step

Analysis and drying plan (24 h). We mapped the moisture content with readings throughout the space and used them to draw up a targeted drying plan, with the right equipment in the right places.

Construction drying. Vernast placed professional construction dehumidifiers and dehumidifiers strategically around the space. Thanks to continuous operation and monitoring, the moisture was drawn out of the walls and the air step by step.

Preventive mould treatment (3 working days). To stop the moisture present from leading to mould growth, we carried out a preventive treatment while the space continued to dry.

Climate recovery (4 working days). The space was dried in a controlled way to safe values, monitored with climate and moisture measurements. That gave the event venue a dry, stable base on which the finishing and fit-out could continue without risk.

Behind the scenes

The project in pictures

From the first moisture reading to the dried-out event space in Boom. Browse with the arrows or pick an image below.

Exhibition space in Boom at the start of the construction drying
1 / 22The exhibition space at the start of the construction drying
Fresh plasterwork with a raised moisture content in Boom
2 / 22Fresh plasterwork with a raised moisture content
Moisture reading on the plastered walls
3 / 22Moisture reading on the plastered walls
Overview of the space before the climate was stabilised
4 / 22Overview of the space before the climate was stabilised
Construction dehumidifier set up in the exhibition space
5 / 22Construction dehumidifier set up in the exhibition space
Continuous dehumidification during the drying phase
6 / 22Continuous dehumidification during the drying phase
Drying equipment placed strategically in the space
7 / 22Drying equipment placed strategically in the space
Checking the relative humidity
8 / 22Checking the relative humidity
Targeted drying along the plastered walls
9 / 22Targeted drying along the plastered walls
Monitoring the drying process in Boom
10 / 22Monitoring the drying process
Moisture values gradually brought under control
11 / 22Moisture values gradually under control
Overview of the complete drying set-up
12 / 22Overview of the complete drying set-up
Inspecting the plasterwork during drying
13 / 22Inspecting the plasterwork during drying
Stabilising the indoor climate
14 / 22Stabilising the indoor climate
Measuring the residual moisture in the walls
15 / 22Measuring the residual moisture in the walls
The space ready for further finishing
16 / 22The space ready for further finishing
Dry walls after the construction drying
17 / 22Dry walls after the construction drying
Final check of the moisture content
18 / 22Final check of the moisture content
Climate measurement before the space was fitted out
19 / 22Climate measurement before the fit-out
The exhibition space after the construction drying
20 / 22The exhibition space after the construction drying
Close-up of the finished, dry wall
21 / 22Close-up of the finished, dry wall
The exhibition venue in Boom ready for use
22 / 22The exhibition venue ready for use
The result

From construction moisture to a dry space ready for display

Why clients choose us

Moving fast without disrupting the schedule

In a commercial space, every day counts. Vernast combines a fast diagnosis with a targeted drying plan, carried out by our own team of certified moisture experts and the construction dehumidifiers of Vernast Bouwdrogers. That keeps the handover date achievable, and you never pay twice for the same problem.

After the work

A stable base for art and experience

With the moisture content brought back to safe values and the indoor climate stabilised, the finishing and fit-out of the exhibition space in Boom could go ahead without risk. This project shows how correct measurement and thorough construction drying lay the foundation for a space where aesthetics take centre stage.