Ultimate construction dehumidifier
For large volumes and a heavy moisture load. Check the data sheet and have the set-up matched to the rooms that actually need to dry.
View this unitNeed a construction dehumidifier in Maaseik for a new build, a renovation or water damage? At Vernast you hire construction dehumidifiers to dry screed, plasterwork and damp rooms. Delivery, installation and collection are included in your drying package. Calculate your hire price online or call us for help choosing the right units.
MaaseikThe right price starts with what needs to dry. For a whole house, wet screed or plasterwork you calculate a complete drying package; for a single room, a single unit may be suitable. Delivery in Maaseik is included in your drying package.
You hire a drying package calculated on the volume, the material and the temperature of your site. The price is known in advance and covers delivery, installation, the moisture reading at the start and at handover, and collection. Not dry within the calculated period? Then the hire continues free of charge, under the terms.

You don't need to combine units yourself. We calculate your drying package based on the floor area, the material and the layer thickness. You see the package price in advance, including delivery to postcode 3680, installation, readings before and after, and collection.
A calculated set-up for your floor, matched to the thickness of the screed. The final reading helps you and your floor layer decide when finishing can start.
More about this dryingConstruction dehumidifiers and fans for even drying throughout the house. We choose the capacity and spread the units over the rooms.
More about this dryingA leak or a flood? Have the cause repaired and standing water removed first. We assess the wet materials and match the drying to them.
More about this drying100% drying guarantee included. Is the material still not dry within the calculated period, despite correct drying conditions? Then you keep hiring the units free of charge, under our drying guarantee terms. This applies to calculated packages that we deliver and install; single units for collection are not covered.
No deposit. The calculator shows your total price and the extras you choose yourself, such as a condensate pump, extra heating or an official moisture report.
Vernast delivers to Maaseik and nearby places such as Kinrooi, Dilsen-Stokkem and Bree. Include the full site address in your request and the person who can let us in on site. That way we can arrange delivery and installation in advance.
With a damp cellar or a leak, the work starts with the cause: if water keeps coming in, drying alone is not a lasting solution. Have the leak or water ingress dealt with first and remove any standing water. We then look at which materials are wet and whether the moisture is also under a floor or behind a wall.
New screed and plasterwork bring moisture into the building. When choosing a drying package, the material, thickness, volume and temperature matter most. Let us know when the material was laid as well. The drying set-up and the moment you start must follow the instructions of your contractor or material supplier.
Drying time depends on the conditions on your site. The thickness and make-up of the material, the temperature and the humidity all play a part. A dry surface layer does not automatically mean the whole floor or wall is ready for finishing. Agree the residual moisture check with your floor layer or decorator.


For large volumes and a heavy moisture load. Check the data sheet and have the set-up matched to the rooms that actually need to dry.
View this unit
For air circulation alongside the dehumidifier. A fan helps move air along damp surfaces. It does not remove moisture from the room itself and does not replace the dehumidifier.
View this unit
For a drying set-up after water damage. First establish where the moisture is and how the structure is built up. For moisture under a floor or behind a wall, a tailored approach may be needed.
View this unit
For larger rooms or several drying zones. The capacity you need depends on the volume and the wet materials. The layout of your site decides where the units go.
View this unitWith your drying package, delivery, installation and collection are included. Give us the address in Maaseik, your preferred start date and the access details. Mention a floor without a fixed staircase, a narrow passage or limited parking in advance. The technician installs the units and explains how to use the set-up and check the condensate drain. The agreed delivery is shown in your booking.
You can collect a single unit by appointment from Vernast, Boomsesteenweg 12, unit 11 in Aartselaar. Book in advance so the right unit is ready. Check the collection rates and allow for both the outward and the return trip. Check the dimensions and weight, and follow the transport instructions. If you are unsure about the set-up or need several units, talk to us about a drying package with installation.
Boomsesteenweg 12, Unit 11, 2630 Aartselaar
Mon–Fri 08:00–17:00, by appointment
Sites in Limburg, each with photos of the site itself. The same team, the same reading at the start and at handover.
The table helps you plan the hire period. A guide time does not confirm that the material is dry enough. The check before finishing is still needed.
| What needs to dry | Without a dehumidifier | With a Vernast drying package |
|---|---|---|
| Cement screed 5 cm | 6 to 9 weeks | 2 weeks |
| Cement screed 6 cm | 8 to 12 weeks | 3 weeks |
| Cement screed 7 cm | 10 to 15 weeks | 4 weeks |
| Plasterwork 1 cm | 1 to 2 weeks | 2 weeks |
| Plasterwork 2 cm | 2 to 4 weeks | 3 weeks |
| Plasterwork 3 cm | 3 to 6 weeks | 4 weeks |
The table gives guide values for planning. The actual drying time depends on the material and the conditions on site. Before finishing, have the residual moisture checked against the requirements of your floor layer or decorator. For calculated packages, free continued hire applies under the drying guarantee terms. How long screed needs to dry explains it case by case.
We deliver in Maaseik and the surrounding municipalities. Choose a place below for details on hire and delivery, or see our service area in Limburg.
Delivery to Maaseik, Kinrooi, Dilsen-Stokkem and the other places below. Choose your municipality for details on hiring a dehumidifier.
See for each municipality how to hire a construction dehumidifier, what a drying package includes and how to arrange delivery.
From your request to collection. We agree the installation, explain how to use the units and follow the drying process with moisture readings.
Calculate your package online or call us for advice. Give us your site address, your preferred start date and the dimensions of the rooms.
At the agreed time the technician installs the units, connects the condensate drain and explains how to use them.
Use the set-up as the technician explained. Check the condensate drain and report any faults or new moisture problems.
We check the moisture and arrange collection. For calculated packages, free continued hire applies if the drying guarantee terms are met.
Read how customers experience Vernast's delivery, appointments and follow-up. These reviews are about our service across our whole service area.
“Snelle respons en dezelfde dag nog een droger geïnstalleerd. Top service!”
“Zeer goede service en flexibiliteit. Werken zijn uitstekend uitgevoerd. Vriendelijk personeel. Firma zeker aan te raden.”
“We zijn bijzonder tevreden. Het personeel is professioneel én vriendelijk. Het werk is grondig uitgevoerd. Bovendien werd het achteraf goed opgevolgd.”
Our drying experts will help you straight away, with advice tailored to your situation.
Calculate your drying package online or contact us with your address in Maaseik, the size of the room and your preferred start date. Let us know the floor level and the available power supply too. We then agree the delivery time and access to the site with you.
That depends on the volume, the layout, the material and the amount of moisture. An open-plan floor needs a different set-up from several closed rooms. Use the calculator for your package and ask for advice if your situation is different, for example with a high room or hidden moisture.
The hire period alone gives no certainty about that. Have the residual moisture checked with a method that suits the material. Your floor layer or decorator decides which moisture reading, and any further measurement, is needed before the chosen finish can be applied.
A construction dehumidifier helps remove moisture, but it does not repair a leak, water ingress or a missing damp-proof barrier. Have the cause investigated first. If new water keeps coming in, the material can get wet again, even while the dehumidifier is running.
The connected load differs per unit. Check the data sheet and tell us which connection is available on your site. The 20 and 30 kW electric site heaters need a suitable 400 V supply. If in doubt, have the available capacity and the circuit protection checked.
Collection is possible by appointment from our warehouse in Aartselaar, Boomsesteenweg 12, unit 11. Book your unit in advance and make sure it fits in your vehicle. Follow the transport instructions for the chosen unit. With a delivered drying package, we take care of installation and collection.
Installed and set up by our technician, with a moisture reading at the start and at handover. Prefer to talk it through first? Feel free to call us.

Briefly describe what needs to dry and how big the room is. A drying specialist will reply within one working day, with a proposal for the right package.